Electrical Brackets – Sydney Metro Tunnel Project

In an ongoing project with Burndy Cable Supports for the Sydney and Melbourne Metro tunnels, we are conducting detailed analyses and assessments of numerous electrical brackets and supports to ensure their compliance with codes, specifications, and Australian standards. The analyses cover various critical factors, including: Design Compliance: Throughout the analysis and assessment process, we ensure […]

Monorail Frame

ABA Structures Pty Ltd specializes in designing innovative and unconventional solutions for various structural needs. In one of our recent projects, we designed a unique frame specifically tailored for installation in our client’s workshop. Frame Description: The frame incorporates a monorail beam spanning 8 meters, providing support for a Toshiba 3-tonne trolley. To ensure stability […]

Lithium Mine Thickener Successfully Loaded

Congratulations to ABA Structures and the collaborative efforts of Brenan Engineering and Chess Engineering on the successful installation and leak-free operation of the Lithium Mine Thickener! This accomplishment marks a significant achievement in the field of engineering and sets the stage for exciting opportunities for all parties involved. The Engineering Excellence of ABA Structures: ABA […]

Lithium mine thickener being successfully installed

ABA Structures, in collaboration with BRE Engineering, has successfully engineered a 563 cubic meters thickener for the Bald Hill Lithium project in Western Australia. The accompanying photo showcases the installation of the modules at the project site. This robust thickener, with a diameter of 16m and a maximum height of 6.5m above ground level, is […]

Test jig for 100 tonnes Enerpac Hydralic Ram

Diverse Engineering Pty Ltd has entrusted ABA Structures with the task of designing a jig for testing Enerpac Hydraulic Rams. This specialized jig is intended to accommodate hydraulic rams with a capacity of up to 100 tonnes. The design requires the ram to be inserted lengthwise into the jig and fully pressurized for a specified […]

Technical paper published in a prestigious journal

The paper titled ‘Generalized Winkler support properties for far field modelling of laterally vibrating piles‘ is published in January 2017 in the esteemed ‘Soil Dynamics and Earthquake Engineering‘ Journal, published by Elsevier. This research paper was initially submitted in mid-2014 and underwent an extensive review and editing process that spanned over two years. The publication […]

Lifting Engineering – Heavy Machinery Cylinder

Project: Heavy Cylinder Lifting Frame Client: Joy Global Inc

A Special Structure: The Quadrant

Project: Quadrant Structure Client: Shelf Subsea (Caldive) Function: Hauling subsea data cable line from the installation vessel into the riser and up to the Wheatstone platform. The Quadrant Structure, responsible for efficiently guiding and supporting the subsea data cable line during its installation, was meticulously designed by ABA Structures. This structure, composed of a robust […]